On Site Services
TENSILE TESTING CAN CARRY OUT YOUR WELDING AND PRESSURE TESTING
- Butt Fusion Welding
- Electrofusion Welding
- Hydrostatic Pressure Testing
The key to the success of PE pipeline systems is the ability produce reliable fusion joints with a strength equivalent to the parent pipe. Welds and PE materials if assembled correctly potentially should have a minimum design life of 50 years.
However, this reliability that is achieved simply with modern technology and techniques is being undermined by poor workmanship or training, posing a serious risk to pipe networks.

Buttfusion & Electrofusion Welding

On Site Audits of Welding Practice

On Site Hydrostatic Testing

Chlorination
